Project scope
- storage of mineral oil tanks (with size from 30.000
- litres up to 800.000 litres)
- pump stations
- 8000 m of steel pipeline NW 15 – NW 80
- stearing control units with cabeling
- visualisation
- commissioning
Specifications
- detail-engineering / cost estimate
- 3D-layout-plan / process design (P&ID)
- steel construction / static
- construction pipeline
- control-management Profibus
- fully automated process