Tank farm for engine and hydraulic oil

Project scope

  • piping, pumps, fittings, measurement technology
  • complete electrical engineering incl. visualization

 

Specifications

  • Collecting tank
  • 28 storage tanks a 100 m³
  • 2 matrix distributors for 8 filling lines
  • 17 pigging lines
  • Erection of the plant during running production