Coastal power plant K.I.E.L. - tank farm

Project scope

  • Central tank farm with filling station to supply the gas engines in the power plant.
  • Media: urea solution, lubricating oil and fuel oil (filling lines caustic soda, hydrochloric acid)
  • Complete 3D planning
  • Piping, pump technology, fittings, measurement technology
  • Complete electrical engineering incl. visualization

 

Specifications

  • Standing, double-walled storage tanks (heated) with our bottom outlet.
  • Draining station with sump fully coated (against acid, alkali and oils)
  • Double-walled plastic pipes for caustic soda and hydrochloric acid
  • Redundant 24/7 operation of the urine supply

Contact
Göhler

Finished planning a project and looking for specialist expertise to help you with implementation? We’re up to the challenge! Simply fill out the form with your inquiry or get in touch with our contact for construction & installation!

Your contact

Dipl. -Ing. (FH) Martin Zang

+49 6021 4200 202
+49 178 5805 035

martin.zang@goehler.de

    (*) marked fields are required.