Tank system for fuel supply of test field III:

Project scope

  • Turnkey tank farm for the supply of engine test benches with 5 types of fuel
  • 2 tanks with 100 m³ each
  • pumps with equipment
  • Half-day tank
  • EMSR technology
  • Liquid tight area

 

Specifications

  • Execution in 2 construction stages
  • Execution completely in stainless steel

Contact
Göhler

Looking for a reliable partner who can monitor and maintain your live systems professionally? Then you’ve come to the right place! Get in touch with our contact or send an inquiry directly via our form.

Your contact

Dipl. -Ing. (FH) Sven Stratenwerth

+49 6021 4200 205
+49 178 5805 099

sven.stratenwerth@goehler.de

 

    (*) marked fields are required.