Plant for production of mineral-oil-products


Project scope

  • storage of mineral oil tanks (with size from 30.000
  • litres up to 800.000 litres)
  • pump stations
  • 8000 m of steel pipeline NW 15 – NW 80
  • stearing control units with cabeling
  • visualisation
  • commissioning

Specifications

  • detail-engineering / cost estimate
  • 3D-layout-plan / process design (P&ID)
  • steel construction / static
  • construction pipeline
  • control-management Profibus
  • fully automated process
Construction period
2013 - 2014
Contract volume
9.500.000 €