Tank farm
for engine and hydraulic oil


Project scope

  • piping, pumps, fittings, measurement technology
  • complete electrical engineering incl. visualization

Specifications

  • Collecting tank
  • 28 storage tanks a 100 m³
  • 2 matrix distributors for 8 filling lines
  • 17 pigging lines
  • Erection of the plant during running production
Construction period
11.2014 - 05.2016
Contract volume
5.500.000 €