Detergent and cleaning agent production


Project scope

  • piping, pumps, fittings, measurement technology
  • complete electrical engineering incl. visualization
  • PLC control

Specifications

  • 6 storage tanks for raw material à 30 m³
  • 5 mixing tanks from 3-25 m³
  • 2 dosing stations
  • 1 loading and unloading station for trucks
02.2009 - 08.2009
650.000 €