Tank system for fuel supply
of test field III


Project scope

  • Turnkey tank farm for the supply of engine test benches with 5 types of fuel
  • 2 tanks with 100 m³ each
  • pumps with equipment
  • Half-day tank
  • EMSR technology
  • Liquid tight area

Specifications

  • Execution in 2 construction stages
  • Execution completely in stainless steel
10.2016 - 02.2018
590.000 €
Maintenance
To top